Cloud migration for businesses without compromising business continuity

A phased approach, featuring an actual inventory, pilot testing, and a short, planned cutover window.

Request migration assessment

The starting point

The justified fear of migrating

Halting invoicing, ERP, or production for two days is not an option. This is why many companies postpone migration until the hardware fails and the decision is made in a rush.

  • Servers out of support and without spare parts guarantees
  • Legacy applications with undocumented dependencies
  • Extremely limited or non-existent downtime windows
  • Lack of a rollback plan if something goes wrong

Our response

Migrating with a safety net

Before moving anything, we establish the inventory and the dependency map. We design the target environment, migrate a pilot, validate with key users, and only then execute the cutover, always with a defined reversion plan.

Most failed migrations do not fail because of technology, but because of dependencies that no one documented before starting.

Benefits

What you gain with Cloud Migration

Minimum cutover window

Prior replication and final synchronisation.

Rollback plan

The source environment is maintained until the destination is validated.

User validation

Functional testing before signing off the migration.

No cost surprises

Sized according to measured, not estimated, consumption.

Documentation delivered

Architecture, access, and procedures in writing.

Post-migration support

Monitoring and fine-tuning after the change.

How we work

10-step migration method

  1. 01

    Discovery

    We understand business needs, schedules and constraints.

  2. 02

    Inventory

    Servers, applications, licences and volumes.

  3. 03

    Dependencies

    Workflows between systems, integrations and access.

  4. 04

    Target design

    Destination architecture and sizing.

  5. 05

    Migration plan

    Sequence, windows, owners and risks.

  6. 06

    Pilot

    Migration of a representative subset.

  7. 07

    Migration

    Wave-based execution with prior replication.

  8. 08

    Validation

    Functional and performance testing.

  9. 09

    Cutover

    Final cutover and service redirection.

  10. 10

    Post-migration monitoring

    Monitoring and adjustment during the initial weeks.

What is included

Service capabilities

Physical servers
P2V conversion and workload transfer.
VMware and Hyper-V
Migration of existing virtual machines.
Legacy infrastructure
Legacy systems isolated and stabilised.
Business applications
ERP, CRM and vertical software.
Databases and files
Consistent backups and final synchronisation.
Backup and hybrid workloads
Guaranteed continuity throughout the process.

Why Seintec

Results, not promises

  • We have migrated environments for industry, logistics, healthcare and professional services.
  • The migration plan is delivered in writing before a single server is touched.
  • The destination is our own infrastructure: we control the entire journey.

Frequently Asked Questions

Common pre-engagement questions

How long does a migration take?
It depends on the number of servers, data volume and application dependencies. A small environment can be resolved in a few weeks; one with ERP and connected sites requires a wave-based plan over several months.
Can systems be migrated without downtime?
Operations do not stop during the bulk of the process: replication is carried out while systems are running. There is typically a short cutover window for final synchronisation, usually outside productive hours.
What happens if something fails during the cutover?
The rollback plan is activated: the source environment remains available until the functional validation of the destination is complete.
Can we migrate only a part?
Yes. It is common to start with backup and secondary environments, leaving the production core for a second phase once the model has been validated.

Unsure about a technical term? Browse the IT Glossary

Next step

Request a migration assessment

We inventory your environment and deliver a phased plan including effort, risks and schedule.