Cloud migration for businesses without compromising business continuity
A phased approach, featuring an actual inventory, pilot testing, and a short, planned cutover window.
Request migration assessmentThe starting point
The justified fear of migrating
Halting invoicing, ERP, or production for two days is not an option. This is why many companies postpone migration until the hardware fails and the decision is made in a rush.
- Servers out of support and without spare parts guarantees
- Legacy applications with undocumented dependencies
- Extremely limited or non-existent downtime windows
- Lack of a rollback plan if something goes wrong
Our response
Migrating with a safety net
Before moving anything, we establish the inventory and the dependency map. We design the target environment, migrate a pilot, validate with key users, and only then execute the cutover, always with a defined reversion plan.
Most failed migrations do not fail because of technology, but because of dependencies that no one documented before starting.
Benefits
What you gain with Cloud Migration
Minimum cutover window
Prior replication and final synchronisation.
Rollback plan
The source environment is maintained until the destination is validated.
User validation
Functional testing before signing off the migration.
No cost surprises
Sized according to measured, not estimated, consumption.
Documentation delivered
Architecture, access, and procedures in writing.
Post-migration support
Monitoring and fine-tuning after the change.
How we work
10-step migration method
- 01
Discovery
We understand business needs, schedules and constraints.
- 02
Inventory
Servers, applications, licences and volumes.
- 03
Dependencies
Workflows between systems, integrations and access.
- 04
Target design
Destination architecture and sizing.
- 05
Migration plan
Sequence, windows, owners and risks.
- 06
Pilot
Migration of a representative subset.
- 07
Migration
Wave-based execution with prior replication.
- 08
Validation
Functional and performance testing.
- 09
Cutover
Final cutover and service redirection.
- 10
Post-migration monitoring
Monitoring and adjustment during the initial weeks.
What is included
Service capabilities
- Physical servers
- P2V conversion and workload transfer.
- VMware and Hyper-V
- Migration of existing virtual machines.
- Legacy infrastructure
- Legacy systems isolated and stabilised.
- Business applications
- ERP, CRM and vertical software.
- Databases and files
- Consistent backups and final synchronisation.
- Backup and hybrid workloads
- Guaranteed continuity throughout the process.
Why Seintec
Results, not promises
- We have migrated environments for industry, logistics, healthcare and professional services.
- The migration plan is delivered in writing before a single server is touched.
- The destination is our own infrastructure: we control the entire journey.
Frequently Asked Questions
Common pre-engagement questions
- How long does a migration take?
- It depends on the number of servers, data volume and application dependencies. A small environment can be resolved in a few weeks; one with ERP and connected sites requires a wave-based plan over several months.
- Can systems be migrated without downtime?
- Operations do not stop during the bulk of the process: replication is carried out while systems are running. There is typically a short cutover window for final synchronisation, usually outside productive hours.
- What happens if something fails during the cutover?
- The rollback plan is activated: the source environment remains available until the functional validation of the destination is complete.
- Can we migrate only a part?
- Yes. It is common to start with backup and secondary environments, leaving the production core for a second phase once the model has been validated.
Unsure about a technical term? Browse the IT Glossary
Next step
Request a migration assessment
We inventory your environment and deliver a phased plan including effort, risks and schedule.